MIS 3005-D: the heat pump design standard, clause by clause
MIS 3005-D is the MCS standard that says how a heat pump system must be designed. MCS-certified installers have to follow it, and the Boiler Upgrade Scheme only pays out on systems certified under MCS.
Our free heat pump design software works through these steps in order. It follows the MCS method, but it is not an MCS product and is not endorsed by MCS.
Here is what the current issue asks for, in the order you meet it on a real job. Checked against the MCS document on 31 October 2026.
Which issue is current
MIS 3005 was split into a design standard (MIS 3005-D) and an installation standard (MIS 3005-I), mandatory from 1 April 2022. Issue 2.0 (December 2024) changed the hybrid rules. Issue 3.0, mandatory from 5 December 2025, brought air-to-air heat pumps into scope. The government lists Issue 3.0 as an approved standard for the Boiler Upgrade Scheme.
Separately, MCS is moving installers onto its redeveloped MCS:2025 scheme during 2026, which has its own edition of the standard. Your certification body tells you when you move.
Heat loss: room by room, to BS EN 12831-1:2017
The heat loss must be worked out room by room using BS EN 12831-1:2017. Solid ground floors are calculated against the local annual average outside temperature; suspended floors against the outside design temperature.
| Room | Minimum internal design temperature |
|---|---|
| Living room, dining room, bedsit | 21 °C |
| Bedroom, hall and landing, kitchen, toilet | 18 °C |
| Bathroom | 22 °C |
Outside design temperatures come from CIBSE Guide A for eight UK locations, at either the 99% or the 99.6% level. Using the colder 99.6% figure means no extra allowance for intermittent heating is needed.
| Location | 99% (°C) | 99.6% (°C) |
|---|---|---|
| London | -1.7 | -3.0 |
| Birmingham | -3.2 | -5.1 |
| Manchester | -2.7 | -4.5 |
| Cardiff | -1.5 | -3.1 |
| Plymouth | -0.2 | -1.5 |
| Edinburgh | -3.2 | -5.4 |
| Glasgow | -3.5 | -5.9 |
| Belfast | -1.5 | -3.2 |
Sizing the heat pump
- Heat pump only: it must meet at least 100% of the design heat loss at the design flow temperature, with no electric top-up. Any backup heater must not run above the outside design temperature.
- Air source units should hold room temperatures through defrost cycles.
- Hybrids: all heat sources together meet 100%, and the heat pump alone at least 55% at a 55 °C flow temperature.
- Air-to-air: outdoor units meet 100% of the load, and every habitable room has an indoor unit that meets that room's load.
Flow temperature: the 55 °C rule
High temperature heat pumps should only be used where a flow above 55 °C is really needed. If you propose a design above 55 °C, you must also offer one at 55 °C or below and explain the difference in running cost and efficiency, so the customer can choose.
Hot water
Daily hot water (litres) = 45 × N, where N is bedrooms + 1, or the number of occupants if higher
The heat pump must reach at least a 55 °C flow at design conditions when heating a cylinder, the reheat time is agreed with the customer, and a legionella control method is needed. Existing cylinders need their insulation and condition checked.
What you hand over
Before the contract, the customer gets a performance estimate (MCS 031) and the heat pump and cylinder data. Before installation, the installer needs the design outputs, including:
- Room heat losses in W/m²
- Daily hot water demand and the cylinder specification
- Emitter type and sizes, and the design temperature of the worst room
- Design flow temperature, and the SCOP at that flow temperature
If the design changes after the contract, the customer gets an updated estimate and can cancel without cost. Sound is not part of MIS 3005-D itself: heat pump noise from air source units under permitted development in England is checked with MCS 020(a).
Do it with the free tool
The free tool works through these steps in order: room-by-room heat loss from the postcode, heat pump sizing, emitters at your design flow temperature, hot water to 45 × N and the MCS 031 performance estimate.
Frequently asked questions
What is MIS 3005-D?
The MCS heat pump design standard. It sets how MCS-certified installers work out the heat loss, size the heat pump, choose the flow temperature, size hot water and record the design.
What is the current version of MIS 3005-D?
Issue 3.0, mandatory from 5 December 2025, which added air-to-air heat pumps. Installers moving to the MCS:2025 scheme in 2026 follow that scheme's edition.
Does MIS 3005-D require a room-by-room heat loss?
Yes. The heat loss must be calculated room by room to BS EN 12831-1:2017, with internal temperatures no lower than the standard's Table 1.
What is the difference between MIS 3005-D and MIS 3005-I?
MIS 3005-D covers design: heat loss, sizing, emitters and hot water. MIS 3005-I covers installation, commissioning and handover on site.
Can I go above 55 °C flow temperature?
Only if it's needed, and you must also give the customer a design at 55 °C or lower with the efficiency difference explained.
Related guides
Sources: MCS MIS 3005-D Issue 3.0 (5 December 2025); MCS news on MIS 3005-D Issue 2.0; GOV.UK Boiler Upgrade Scheme approved standards (updated 20 October 2026). Checked 31 October 2026. Free Heat Pump Design follows the MCS method but is not an MCS product and is not endorsed by MCS. Check designs against MCS MIS 3005-D and the official MCS Heat Pump Calculator.